Flooting & Column | Plinth | PCC Floor | Brick Wall Concrete Estimator Make Another Estimation Footing & Column RCC Calculator Footing & Column RCC Calculator Column Width (mm) mm Column Length (mm) mm Column Depth (mm) mm Footing Width (mm) mm Footing Length (mm) mm Footing Depth (mm) mm Column Width (Meter) m Column Length (Meter) m Column Depth (Meter) m Footing Width (Meter) m Footing Length (Meter) m Footing Depth (Meter) m Column Area (Cubic Meter - m³) Cubic Meter - m³ Footing Area (Cubic Meter - m³) Cubic Meter - m³ Concrete Grade M20 GRADE : 1:1.5:3M25 GRADE : 1:1:2 Ratio ₹ Per Cement Bag ₹ Total Cement Cost For Column ₹ ₹ Per Sand Truck ₹ Total Sand Cost For Column ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost For Column ₹ ₹ Per Cement Bag ₹ Total Cement Cost For Footing ₹ ₹ Per Sand Truck ₹ Total Sand Cost For Footing ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost For Footing ₹ ₹ Per Cement Bag ₹ Total Cement Cost For Column ₹ ₹ Per Sand Truck ₹ Total Sand Cost For Column ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost For Column ₹ ₹ Per Cement Bag ₹ Total Cement Cost For Footing ₹ ₹ Per Sand Truck ₹ Total Sand Cost For Footing ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost For Footing ₹ Cement Bags Required For Column Bags Cement Bags Required For Footing Bags Sand Required For Column Tonne Sand Required For Footing Tonne Aggregate Required For Column Tonne Aggregate Required For Footing Tonne Cement Bags Required For Column Bags Cement Bags Required For Footing Bags Sand Required For Column Tonne Sand Required For Footing Tonne Aggregate Required For Column Tonne Aggregate Required For Footing Tonne Total Bags Of Cement For Column & Footing Bags Total Sand For Column & Footing (Tonne) (1 Cft = 45.31 Kgs) Tonne Total Aggregate For Column & Footing (Tonne) (1 Cft = 51 Kgs) Tonne Total Bags Of Cement For Column & Footing Bags Total Sand For Column & Footing (Tonne) (1 Cft = 45.31 Kgs) Tonne Total Aggregate For Column & Footing (Tonne) (1 Cft = 51 Kgs) Tonne Total Number Of Column & Footing Nos Total Cement Cost For Column & Footing ₹ Total Sand Cost For Column & Footing ₹ Total Aggregate Cost For Column & Footing ₹ Total Number Of Column & Footing Nos Total Cement Cost For Column & Footing ₹ Total Sand Cost For Column & Footing ₹ Total Aggregate Cost For Column & Footing ₹ Submit If you are human, leave this field blank. Plinth RCC Calculator Plinth RCC Calculator Width (Feet) Length (Feet) Thickness / Depth (mm) Width (Meter) Length (Meter) Thickness / Depth (Meter) Total Area (Cubic Meter - m³) Total Area (Cubic Feet - ft³) Concrete Grade M20 GRADE : 1:1.5:3M25 GRADE : 1:1:2 Cement Sand Aggregate Sum Of Ratio Cement Sand Aggregate Sum Of Ratio Total Wet Volume Dry Volume = Total Wet Volume x 1.54 Cement Required Ratio 1:1.5:3 Kgs Total Bags Of Cement Bags Cement Required Ratio 1:1:2 Kgs Total Bags Of Cement Bags Sand Required (Density Considered : 1600 kg/m³) Ratio 1:1.5:3 Cft Total Sand (Tonne) (1 Cft = 45.31 Kgs) Tonne Sand Required (Density Considered : 1600 kg/m³) Ratio 1:1:2 Cft Total Sand (Tonne) (1 Cft = 45.31 Kgs) Tonne Aggregate Required (Density Considered : 1800 kg/m³) Ratio 1:1.5:3 Cft Total Aggregate (Tonne) (1 Cft = 51 Kgs) Tonne Aggregate Required (Density Considered : 1800 kg/m³) Ratio 1:1:2 Cft Total Aggregate (Tonne) (1 Cft = 51 Kgs) Tonne ₹ Per Cement Bag ₹ Total Cement Cost ₹ ₹ Per Sand Truck ₹ Total Sand Cost ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost ₹ ₹ Per Cement Bag ₹ Total Cement Cost ₹ ₹ Per Sand Truck ₹ Total Sand Cost ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost ₹ Total Material Cost ₹ Total Bags Of Cement Bags Water Cement Consumption : M20 : 0.55 Liters Total Material Cost ₹ Total Bags Of Cement Bags Water Cement Consumption : M25 : 0.50 Liters Submit If you are human, leave this field blank. PCC Floor Calculator PCC Floor Calculator Width (Feet) Length (Feet) Thickness / Depth (mm) Width (Meter) Length (Meter) Thickness / Depth (Meter) Total Area (Cubic Meter - m³) Total Area (Cubic Feet - ft³) Concrete Grade M5 GRADE : 1:5:10M7.5 GRADE : 1:7.5:10M10 GRADE : 1:3:6M15 GRADE : 1:2:4M20 GRADE : 1:1.5:3M25 GRADE : 1:1:2 Cement Sand Aggregate Sum Of Ratio Cement Sand Aggregate Sum Of Ratio Cement Sand Aggregate Sum Of Ratio Cement Sand Aggregate Sum Of Ratio Cement Sand Aggregate Sum Of Ratio Cement Sand Aggregate Sum Of Ratio Total Wet Volume Dry Volume = Total Wet Volume x 1.54 Cement Required Ratio 1:5:10 Kgs Total Bags Of Cement Bags Cement Required Ratio 1:7.5:10 Kgs Total Bags Of Cement Bags Cement Required Ratio 1:3:6 Kgs Total Bags Of Cement Bags Cement Required Ratio 1:2:4 Kgs Total Bags Of Cement Bags Cement Required Ratio 1:1.5:3 Kgs Total Bags Of Cement Bags Cement Required Ratio 1:1:2 Kgs Total Bags Of Cement Bags Sand Required (Density Considered : 1600 kg/m³) Ratio 1:5:10 Cft Total Sand (Tonne) (1 Cft = 45.31 Kgs) Tonne Sand Required (Density Considered : 1600 kg/m³) Ratio 1:7.5:10 Cft Total Sand (Tonne) (1 Cft = 45.31 Kgs) Tonne Sand Required (Density Considered : 1600 kg/m³) Ratio 1:3:6 Cft Total Sand (Tonne) (1 Cft = 45.31 Kgs) Tonne Sand Required (Density Considered : 1600 kg/m³) Ratio 1:2:4 Cft Total Sand (Tonne) (1 Cft = 45.31 Kgs) Tonne Sand Required (Density Considered : 1600 kg/m³) Ratio 1:1.5:3 Cft Total Sand (Tonne) (1 Cft = 45.31 Kgs) Tonne Sand Required (Density Considered : 1600 kg/m³) Ratio 1:1:2 Cft Total Sand (Tonne) (1 Cft = 45.31 Kgs) Tonne Aggregate Required (Density Considered : 1800 kg/m³) Ratio 1:5:10 Cft Total Aggregate (Tonne) (1 Cft = 51 Kgs) Tonne Aggregate Required (Density Considered : 1800 kg/m³) Ratio 1:7.5:10 Cft Total Aggregate (Tonne) (1 Cft = 51 Kgs) Tonne Aggregate Required (Density Considered : 1800 kg/m³) Ratio 1:3:6 Cft Total Aggregate (Tonne) (1 Cft = 51 Kgs) Tonne Aggregate Required (Density Considered : 1800 kg/m³) Ratio 1:2:4 Cft Total Aggregate (Tonne) (1 Cft = 51 Kgs) Tonne Aggregate Required (Density Considered : 1800 kg/m³) Ratio 1:1.5:3 Cft Total Aggregate (Tonne) (1 Cft = 51 Kgs) Tonne Aggregate Required (Density Considered : 1800 kg/m³) Ratio 1:1:2 Cft Total Aggregate (Tonne) (1 Cft = 51 Kgs) Tonne ₹ Per Cement Bag ₹ Total Cement Cost ₹ ₹ Per Sand Truck ₹ Total Sand Cost ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost ₹ ₹ Per Cement Bag ₹ Total Cement Cost ₹ ₹ Per Sand Truck ₹ Total Sand Cost ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost ₹ ₹ Per Cement Bag ₹ Total Cement Cost ₹ ₹ Per Sand Truck ₹ Total Sand Cost ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost ₹ ₹ Per Cement Bag ₹ Total Cement Cost ₹ ₹ Per Sand Truck ₹ Total Sand Cost ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost ₹ ₹ Per Cement Bag ₹ Total Cement Cost ₹ ₹ Per Sand Truck ₹ Total Sand Cost ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost ₹ ₹ Per Cement Bag ₹ Total Cement Cost ₹ ₹ Per Sand Truck ₹ Total Sand Cost ₹ ₹ Per Aggregate Truck ₹ Total Aggregate Cost ₹ Total Material Cost ₹ Total Bags Of Cement Bags Water Cement Consumption : M5 : 0.60 Liters Total Material Cost ₹ Total Bags Of Cement Bags Water Cement Consumption : M7.5 : 0.60 Liters Total Material Cost ₹ Total Bags Of Cement Bags Water Cement Consumption : M10 : 0.60 Liters Total Material Cost ₹ Total Bags Of Cement Bags Water Cement Consumption : M15 : 0.60 Liters Total Material Cost ₹ Total Bags Of Cement Bags Water Cement Consumption : M20 : 0.45 - 0.50 Liters Total Material Cost ₹ Total Bags Of Cement Bags Water Cement Consumption : M25 : 0.40 Liters Submit If you are human, leave this field blank. Brick Wall Calculator Brick Wall Calculator Wall Height (Feet) Feet Wall Length (Feet) Feet Wall Thickness (Inch) Inch Wall Height (m) m Wall Length (m) m Wall Thickness (m) m Width (Inch) Inch Length (Inch) Inch Thickness / Depth (Inch) Inch Width (m) m Length (m) m Thickness / Depth (m) m Volume Of Bricks Without Mortar Cubic Meter - m³ Brick Width x Brick Length x Brick Depth Volume Of Bricks With Mortar Cubic Meter - m³ (Brick Width + 10 mm) x (Brick Length + 10 mm) x (Brick Depth + 10 mm) Number Of Bricks Number Of BricksNos Wet Volume / Volume Of Bricks With Mortar (Wet Volume = 1 Cubic Meter) Volume Of Wet Mortar Total Volume - (Number Of Bricks x Volume Of Bricks Without Mortar) Dry Coefficient Dry Volume Of Mortar Quantity Of Cement and Sand Ratio Of Mortar Normal Bricks : 1:4Soft Bricks : 1:5Very Soft Bricks : 1:6 Quantity Of Cement For 1 Cubic Meter Brick Work Bags Dry Volume x ((Ratio Of Cement x Density Of Cement)/(Sum Of Ratio x Kgs Per Bag)) Quantity Of Sand For 1 Cubic Meter Brick Work Cubic Feet - Cft Dry Volume x ((Ratio Of Sand x 35.32 Cubic Feet)/Sum Of Ratio) Quantity Of Cement For 1 Cubic Meter Brick Work Bags Dry Volume x ((Ratio Of Cement x Density Of Cement)/(Sum Of Ratio x Kgs Per Bag)) Quantity Of Sand For 1 Cubic Meter Brick Work Cubic Feet - Cft Dry Volume x ((Ratio Of Sand x 35.32 Cubic Feet)/Sum Of Ratio) Quantity Of Cement For 1 Cubic Meter Brick Work Bags Dry Volume x ((Ratio Of Cement x Density Of Cement)/(Sum Of Ratio x Kgs Per Bag)) Quantity Of Sand For 1 Cubic Meter Brick Work Cubic Feet - Cft Dry Volume x ((Ratio Of Sand x 35.32 Cubic Feet)/Sum Of Ratio) Total Wall Area Cubic Meter - m³ Total Number Of Bricks Number Of BricksNos Total Number Of Cement Bags Bags Total Sand In Cft Cubic Feet - Cft Submit If you are human, leave this field blank. Footing and Column Plinth PCC Floor Brick Wall